TM 9-2350-222-20-1-3
TURBOSUPERCHARGER OIL DRAIN TUBE (LEFT BANK) REPLACEMENT (Sheet 4 of 4)
9.
lnstall two clamps (H) on hoses (A) and (G).
Install tube assembly (J) between tube (K) and tub (L).
10.
Position new gasket (M) on flange (N) of tube assembly (J).
11.
12.
Using socket, install two bolts (P) and two new lockwashers (Q) to secure tube assembly (J).
Using screwdriver, tighten six clamps to secure hoses to tubes.
13.
Replenish engine oil (LO 9-2350-222-12).
14.
15.
Start engine and check oil drain line assembly for leaks.
16.
Disconnect powerplant test (ground hop) equipment (page 5-62).
17.
Install 2A powerplant (page 5-14) or 2D powerplant (page 5-37).
18.
End of Task
TA139433
6-65