TM9-2350-222-20-1-3
TURBOSUPERCHARGER OIL DRAIN TUBE (RIGHT BANK) REPLACEMENT
(Sheet 1of4)
PROCEDURE INDEX
PROCEDURE
PAGE
Removal
Inspection
Installation
TOOLS: 1/2 in. socket with 1/2 in. drive
9/16 in. combination box and
open end wrench
Flat-tip screwdriver
5/8 in. combination box and
open end wrench
SPECIAL TOOLS: Ground hop kit (Item 30, Chapter 3, Section I)
SUPPLIES: Gasket (8682772)
Lockwasher (7410218) (2 required)
REFERENCE: LO 9-2350-222-12
PRELIMINARY PROCEDURES: Remove powerplant (page 5-1)
Remove generator (page 10-5)
NOTE
If clamp (A) cannot be loosened
with screwdriver, use 5/1 6 inch
wrench.
1.
Using screwdriver, loosen six clamps (A) on three hoses (B) on each end of upper drain tube.
2.
Using 9/16 inch wrench, disconnect hose (C) from generator oil drain check valve (D).
3.
Using 5/8 inch wrench, disconnect generator oil drain check valve (D) from tube assembly (E).
Go on to Sheet 2
TA139426
6-58