TM
5-5420-226-20-1
Symptom-74
DETAILED
TROUBLESHOOTING
PROCEDURE
SUPPORT
SYSTEM
- PERSONNEL
HEATER
FRO\f
STEP
(Continued)
I
Check basket-control
panel heater harness
(CKT 405)
at basket
disconnect
for electrical
power.
Second
Technician
(Operators
Station)
l Set HEATER
MASTER
switch
OFF.
First
Technician
(Personnel
Heater)
l Connect heater to basket disconnect
harness
connector
to personnel
heater.
First
Technician
(Commanders
Station)
l Displace
basket-control
panel
heater
harness
(CKT
405) at basket
disconnect.
l Connect red probe of meter to contact F (CKT 405) of
basket-control
panel heater
harness
connector
at basket
disconnect
and black
probe
to ground.
Second
Technician
(Operators
Station )
l Set HEATER
MASTER
switch
ON.
First
Technician
(Commanders
Station)
l Check if meter indicates
18 to 30 volts dc.
Does
meter
indicate
18 to 30 volts dc?
c
khiAzEll
CONTACT
lo
I
YES
FOR CLARITY
QUADRANT
ASSEMBLIES
NOT SHOWN
h
heater
to
basket
disconnect
harness
for bent/
broken
connector
contacts
or
loose CKT 405 wire at rear of
connectors.
l Repair connectors
if defective
(page
10-298).
l If
connectors
are
not
defective,
notify
support
maintenance
of
defective
heater
to
basket
disconnect
harness.
l Install
basket-control
panel
heater
harness
connector
at
basket
disconnect.
TA107
4-714