TM
5-5420-226-20-1
(
Symptom-74
DETAILED
TROUBLESHOOTING
PtiOCED
SUPPORT
SYSTEM
- PERSONNEL
HEAT
(Continued)
I
Check
PERSONNEL
HEATER
Hi/LO
switch
between
\
terminals
2 and 3 for continuity
(PERSONNEL
HEATER
;
Hi/LO
switch
ON-HI).
~
First
Technician
(Commanders
Station)
/
l Install basket-control
panel heater
harness
connector
at
basket
disconnect.
Second
Technician
(Operators
Station)
l
SORIES
NESS
ECTOR
l
l
l
Disconnect
basket-control
panel
accessories
harness
connector
from
master
control
panel.
Remove 4 screws,
nuts and washers
from master control
panel
accessories
harness
connector
and
unmount
connector
from
master
control
panel.
Set PERSONNEL
HEATER
HI/LO
switch
ON-HI.
Connect
red probe of meter
to HI/LO
switch
terminal
.
L.
Connect
black probe of meter to Hi/LO
switch terminal
3.
Check
if meter
indicates
continuity.
Does meter
indicate
continuity?
I
l Replace PERSONNEL
HEATER
Hi/LO
switch
(page
10-77).
l Install
control
panel
acces-
sories
harness
connector
in
master
control
panel.
l Connect
basket-control
panel
accessories
harness
connector
to
master
control
panel connector.
l Connect
basket-control
panel
heater
harness
connector
to
master
control
panel
connector.
l Install
master
control
panel
(page
10-33).
l Connect
heater
to
basket
disconnect
harness connector
to personnel
heater fuel pump.
TA1074OO
4-711
