Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
DETAILED TROUBLESHOOTING PROCEDURE SUPPORT SYSTEM - PERSONNEL HEATER CONT. - TM-5-5420-226-20-1_940
DETAILED TROUBLESHOOTING PROCEDURE SUPPORT SYSTEM - PERSONNEL HEATER CONT. - TM-5-5420-226-20-1_942
TM-5-5420-226-20-1 Medium Girder Bridge Incuding Bridge Set Bridge Erection Set Link Reinforcement Set Manual
Page Navigation
910
911
912
913
914
915
916
917
918
919
920
TM
5-5420-226-20-1
Symptom-73
DETAILED
TROUBLESHOOTING
PROCEDURE
T
SUPPORT
SYSTEM
- PERSONNEL
HEATER
(Continued)
~ Check
for electrical
power
at personnel
heater
fuel
pump (CKT 402).
First
l
l
l
Technician
(Personnel
Heater)
Disconnect
harness
connector
in personnel
heater
fuel pump
power
lead.
Set
multimeter
to measure
18 to 30voltsdc,
or use
STE/ICE
Test
No.
89 (page
4-81).
Connect
red probe
of meter
to harness
connector
(CKT
402) and black
probe
to ground.
Second
Technician
(Operator’s
Station)
l
Set HEATER
MASTER
switch
ON.
l
Set PERSONNEL
HEATER
HVLO
First
Technician
(Personnel
Heater)
switch
ON-LO
l
Check
if meter
indicates
18 to 30 volts
dc.
Does meter
indicate
18 to 30 volts dc?
Set PERSONNEL
HEATER
H1/
LO switch
OFF.
Replace
personnel
heater
fuel
pump (page
18-24).
Connect
fuel
line
quick
disconnect
at
personnel
heater.
ESS
CTOR
402)
P
PUMP
(
cJo-
YES
NO
I
I
CKT
)
l
Set PERSONNEL
HEATER
H1/
LO switch
OFF.
l
Inspect
heater
to
basket
disconnect
harness
for bent/
broken
connector
contact
or
loose CKT 402 wire at rear of
connector.
l
Repair
connector
if defective
(page
10-298).
l
If connector
is not defective,
notify
support
maintenance
of
defective
heater
to basket
disconnect
harness.
l
Connect
CKT 402 connector
at
fuel pump.
l
Connect
fuel
line
quick
disconnect
at
personnel
heater.
TA107383
4-694
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business