TM 5-5420-226-20-1
Symptom-27
DETAILED
TROUBLESHOOTING
PROCEDURE
---
-.
VEHICLE
OPERATION
- HULL POWER
(Continued)
Check
starting
harness connector
(CKT 459A) at
master control panel for electrical power.
Second Technician
(Operators Station)
l
l
First
l
l
l
Set MASTER
BATTERY
switch OFF.
Displace master control panel (page 10-33).
Technician
(Commanders
Station)
Install basket-control
panel starting
harness at
basket disconnect.
Connect
front accessory harness connector
(CKT
459A) to master relay.
Install floor access cover (page 17-9).
Second Technician
(Operators
Station)
l
l
l
l
Disconnect
basket-control
panel starting harness
connector
(CKT 459A) from master control panel.
Connect red probe of meter to contact E (CKT 459A) of
control
panel starting
harness
connector
and
black
probe to ground.
Set MASTER
BATTERY
switch ON.
Check if meter indicates
18 to 30 volts dc.
Does meter indicate 18 to 30 volts dc?
starting
harness
(page 10-97).
l Connect basket-control
panel
starting
harness
connector
at
master control
panel.
l Install master control
panel
(page 10-33).
0
3° o~
OE OH OB
O Go AO
(
1
*\
0-
.
0
TO VEHICLE
GROUND
[
CONTACT
E
(CKT 459A)
MASTER
CONTROL \
P
(R
l Inspect basket-control
panel
starting
harness for bent/bro-
ken
connector
contacts
or
loose CKT 459A wire at rear of
connectors.
l Repair connectors if defective
(page 10-298).
l If
connectors
are
not
defective,
notify
support
maintenance
of
a defective
basket-control
panel
starting
harness.
l Install master control panel
(page 10-33).
TA107O68
4-379