TM 5-2350-262-20-2
Change 3 4-855
I
Loosen ten locknuts (10) on studs (11) of No. 1
roadwheel (2)
CAUTION
Place SPRUNG/UNSPRUNG lever
between positions. Failure to comply
may result in damage to actuators.
J Place hydraulic jack behind roadwheel arm
(12), and raise roadwheel arm (12) until No. 1
roadwheel (2) clears center guides of track (6).
K Remove ten locknuts (10), washers (13), outer
roadwheel (14), and inner roadwheel (15) from
studs (11).
L Loosen ten locknuts (16) on studs (17) of
roadwheel (18).
CAUTION
Place SPRUNG/UNSPRUNG lever
between positions. Failure to comply
may result in damage to equipment.
M Place hydraulic jack behind roadwheel arm (19)
and raise roadwheel arm (19) until roadwheel
(18) clears center guides of track (6).
N Connect chain and chain hoist to rear lifting eye
shackle (20), top of ejector or other suitable
location, and to track (6).
O Raise track (6) until center guides of track (6)
clear roadwheel (18).
P Remove ten locknuts (16), washers (21), outer
roadwheel (22), and inner roadwheel (23) from
studs (17).
Q Remove hydraulic jack from roadwheel arm
(19).
