TM 9-2350-222-20-2-1
SEMIANNUAL (180 DAY) PREVENTIVE MAINTENANCE (CONT)
2-2.
Winch and Boom
b.
TOOLS: Welding equipment
SUPPLIES: Grease (automotive and artillery)
Dry cleaning solvent
Corrosion preventive compound
Safety gloves
PERSONNEL: One
REFERENCES: TM 9-2350-222-10 for procedure to operate winch and boom
LO 9-2350-222-12 for procedures to:
Check and replenish winch oil level
Lubricate sheave, trunnions, and snatch block
TM 9-2350-222 -20-2-3 for procedures to:
Remove and install winch cable
Remove and install staylines
Remove and install boom sheave
TM 3-1040-266-20 and TM 3-1040-266-20P for welding procedures
Procedure
Reference
Step
Item to be Inspected
LO 9-2350-222-12
Check oil level. Replenish if
Winch
1.
necessary.
GO TO FRAME 2
Para 2-2 Cont
Change 3
2-6