TM 9-2350-222-20-1-3
2D ENGINE POWER PLANT TESTS (GROUND HOP) (Sheet 2 of 15)
TEST HOOK-UP:
NOTE
All or any one test can be performed in any order. If more
than one test is to be performed, do not disconnect test
hookup.
Disconnect test hookup only when test or tests are complete.
NOTE
No
two
cable
and
hose
connectors a r e t h e s a m e .
Match ground hop cable and
hose connectors with engine
cable and hose connectors for
hookup procedures.
1.
Position and support
powerplant so that
there is free air circula-
tion and access to
2.
Position powerplant
close to hull to permit
connection of electrical
cable assemblies and
fuel hose assemblies.
3.
Connect cable assem-
blies and hose assemblies
Go on to Sheet 3
Change 4
5-49