TM 9-2350-222-20-1-4
PARKING BRAKE CONTROL ASSEMBLY REPLACEMENT (ENGINE COMPARTMENT)
( S h e e t 13 of 15)
Install bellcrank (Z) onto stud (AA).
28.
Install two flat washers (AB) onto stud (AA).
29.
Install nut (AC) onto stud. Using 9/16 inch
30.
wrench, tighten nut.
Back off nut (AC) to aline slots in nut with hole
31.
in stud.
Install new cotter pin (AD) through stud hole.
32.
Using pliers, bend cotter pin to prevent it from
falling out.
Position clevis (AE) to bellcrank (Z).
33.
NOTE
If your vehicle is equipped with
the two-piece brake control cable
p e r f o r m steps 36.1 thru 36.3
and proceed to step 37. If your
vehicle is equipped with the one-
p i e c e brake control cable pro-
ceed to step 34.
Install pin (AF) and washer (AG) to secure
34.
clevis to bellcrank.
Install new cotter pin (AH) through hole in
35.
pin (AF).
Using pliers, bend cotter pin (AH) to prevent
36.
it from falling out.
Go on to Sheet 14
TA253448
13-96
Change 1