TM 9-2350-222-20-20-3-2
HOLD-CLOSE HANDLE INSTALLATION PROCEDURE (CONT)
36-45.
II
FRAME 1
Procedure
Step
1.
Open cupola hatch (TM-10).
Put light coating of oil on outside of bushing (1) and bushing hole of hold-close handle (2)
2.
Put bushing (1) in hold-close handle (2).
3.
Put new self-locking screw (3) through flat washer (4), bushing (l), shims (5), and cupola hatch (6).
4.
Using torque wrench, torque screw (3) from 9 to 11 foot pounds (12 to 15 Newton meters).
5.
NOTE
Follow-on Maintenance Action Required:
END OF TASK
Para 36-45 Cont
36-115
Change 2