TM 9-2350-222-20-2-3-2
36-40. HOLD-OPEN HANDLE INSTALLATION PROCEDURE (CONT)
Procedure
Step
NOTE
During handle operation, there should be minimum
clearance between cam and cover. There should be no
binding or rubbing by cover throughout full travel of
cam. Omit steps 2 thru 6 if correct clearance is obtained
in step 1.
Using feeler gauge, move handle (1) and check for clearance of 0.015" maximum
1.
between cam (2) and cover (3) throughout full travel of cam (JPG).
NOTE
If cam rubs cover, add shims. If cam is too far from
cover, remove shims.
2.
Using socket wrench, remove screw (4).
Remove or add shims (5) as required to screw (4) between cover (3) and cupola hatch
3.
(6).
4.
Put in screw (4).
Using socket wrench, tighten screw (4).
5.
6.
Repeat steps 1 through 6 until cover (3) is adjusted.
END OF TASK
Para 36-40 Cont
36-100