TM 9-2350-222-20-2-1
SEMIANNUAL (180 DAY) PREVENTIVE MAINTENANCE (CONT)
2-2.
Winch and Boom (Cont)
b.
Reference
Procedure
Item to be Inspected
TM 20-2-3
Remove and service cable.
a.
Winch Cable and
1.
(para 62-2, 62-3)
Drum
Check entire length of cable
b.
for loose strands, kinks, cuts,
or broken wire. Replace
entire cable if damage is
evident.
Grease trunnion with GAA.
LO 9-2350-222-1
Boom Trunnion
2.
Fittings
TM 20-2-3
a.
Check cable for loose
Stayline Clevis Pins
3.
strands, kinks, cuts, or
(para 62-4, 62-5)
and Cables
broken wire. Replace
cable if damage is
evident.
b.
Check clevis pins for
missing cotter pins.
LO 9-2350-222-12
c.
Clean cables with dry
cleaning solvent and coat
with corrosion cleaning
compound.
a.
Check sheave and shaft
TM 20-2-3
Sheave
4.
for damage. Replace
(para 66-2, 66-3)
sheave or shaft if
damaged.
Check sheave for any
b.
missing cotter pins.
LO 9-2350-222-12
Turn sheave to check
c.
freedom of movement.
Clean and lubricate with
grease as required.
GO TO FRAME 3
Para 2-2 Cont
Change
3
2-7