TM 9-2350-222-20-1-4
ENGINE OIL PRESSURE TRANSMITTERREPLACEMENT (2D ENGINE) (Sheet 1 of 3)
INSTALLATION:
NOTE
P r i o r to installation, l i g h t l y c o a t m a l e t h r e a d s o f a l l
components with sealing compound (Item 20, Appendix D).
1.
Using pipe wrench, install elbow (A) to engine.
2.
Using 3/4 inch wrench, install pipe bushing (B) to elbow (A).
Using 7/8 inch wrench, install new transmitter (C) to pipe bushing (B).
3.
Push socket of rubber insulated connector (D) into transmitter cap (E).
4.
5.
Remove rags from under engine oil high pressure transmitter.
6.
Connect engine for powerplant ground hop (page 5-48).
7.
Start and run engine. Observe oil pressure indicator for normal oil pressure (TM 9-2350- 222-10).
8.
Shut down engine. Disconnect engine from powerplant ground hop (page 5-62).
9.
Install powerplant (page 5-37).
End of Task
TA139820
10-269