TM 9-2350-222-20-1-3
MANIFOLD HEATER INPUT SOLENOID VALVE AND FUEL LINE REPLACEMENT
(Sheet 6 of 10)
Input Solenoid Valve Replacement (Sheet 1 of 5)
PROCEDURE INDEX
PROCEDURE
PAGE
Removal
Installation
TOOLS: 7/16 in. combination box and open end wrench
1/2 in. combination box and open end wrench
5/8 in. combination box and open end wrench
5/16 in. combination box and open end wrench
9/16 in. combination box and open end wrench
3/8 in. combination box and open end wrench
Flat-tip screwdriver
SPECIAL TOOLS: Ground hop kit (Item 30, Chapter 3, Section I
SUPPLIES: Container to catch fuel leakage
Rags (Item 65, Appendix D)
Sealing compound (Item 28, Appendix D)
Lockwasher (MS35338-43) (2 required)
REFERENCE: TM 9-2350-222-10
PRELIMINARY PROCEDURE:
Go on to Sheet 2
TA149102
7-402