(
TM 5-5420-226-20-1
SvmtMom-28
DETAILED
TROUBLESHOOTING
PROCEDURE
..
&
STEP
13
CONTINUED
VEHICLE
OPERATION
- HULL
POWER
(Continued)
l Check if meter indicates continuity.
I
Does meter indicate
continuity?
,
l
l
l
l
l
l
l
l
l
Inspect
hull power
harness
from
battery
to master
relay
circuit
breaker
for bent/
broken
connector
contacts
or loose CKT 400-459 wire at
rear of connectors.
Repair connectors
if
defective
(page 10-298).
If connectors
are not
defective,
notify
support
maintenance
of bad hull
power
harness.
.
Connect
hull power
harness
connectors
to master
relay
circuit
breaker.
Install floor
access
cover
(page 17-9).
Connect
three battery
ground
straps (page 10-268).
Install
basket-control
panel
power
harness
connector
at
basket
disconnect.
Connect
basket-control
panel
power
harness
connector
to
master
control
panel.
Install
master
control
panel
(page 10-33).
1
CKT
I
J
CONTACT
I
-1
(
-@-
)
l inspect basket-control
panel
power
harness for bent/
broken
connector
contacts
or
loose CKT 400-459 wire at rear
of connectors.
l Repair connectors if defective
(page10-298).
l If connectors are not
defective,
notify
support
maintenance
of bad basket-
control
panel power
harness.
l Connect hull power harness
connectors
to master
relay
circuit
breakers.
l Install floor access cover
(page 17-9).
l Install basket-control
panel
power
harness
connector
at
basket
disconnect.
l Connect basket-control
panel
power
harness
connector
to
master
control
panel.
l Install master control panel
(page 10-33).
l Connect three battery
ground
straps
(page 10-268).
TA107O79
4-390
