TM 5-5420-226-20-1
Symptom-9
DETAILED
TROUBLESHOOTING
PROCEDURE
VEHICLE
OPERATION
- POWERPLANT,
STARTING
(Continued)
Check engine electrical harness connector (CKT
486) at manifold heater fuel supply solenoid for
electrical power.
Second
Technician
(Rear
of Crew
Compartment)
l Disconnect
engine
electrical
harness
connector
from
manifold
heater
fuel supply
solenoid
connector.
l Connect
red probe
of meter
to contact
A (CKT
486)
of engine
electrical
harness
connector
and black
probe
to ground.
l Observe
meter
for voltage
indication
when
first
technician
operates
switches.
First
Technician
(Operators
Station)
l Place manual
fuel shutoff
in the OFF
(out)
position.
l Set MASTER
BATTERY
switch
ON.
l At the same time, press STARTER
button
and
manifold
preheat
switch
for about
10 seconds,
then
release.
l Place manual
fuel shutoff
switch
in the ON
(in)
position.
Does meter indicate 18 to 30 volts dc?
I
~
Qg$ijJy:
al
%
.-
-
.,,1,,,
---
CKT
3
-n
+
o
II
II
TO VEHICLE
II
c
MANIFOLD
HEATER
FUEL SUPPLY
SOLENOID
~
epai,
harness (CKT 486) (page 10-298).
-~
CKT
ENGINE
FUEL SUPPLY
COiTACT
TA106923
4-234
