TM
5-5420-226-20-1
Symptom-6
FROM
STEP
DETAILED
TROUBLESHOOTING
PROCEDURE
o
VEHICLE
OPERATION
- POWERPLANT,
STARTING
2
(Continued)
.
Check
basket-control
panel starting
harness
(CKT 76) for continuity.
l Reconnect basket-control panel power harness
to
master
control
panel.
l Connect
black
probe
of meter
to contact
C (CKT
76) of basket-control
panel
starting
harness
connector
at master
control
panel.
Technician
(Commanders
Station)
l Displace basket-control
panel
starting
harness
(CKT
76) from
basket
disconnect.
l Connect
red probe
of meter
to basket-control
panel
starting
harness
connector
contact
C (CKT
76) at
basket
disconnect.
l Check if meter indicates
continuity.
Does meter
indicate
continuity?
B
aa>
o
-a
n+
o
FOR CLARITY
QUADRANT
ASSEMBLIES
NOT SHOWN
MASTER
CONTROL
PANEL
(REAR
VIEW)
TA106877
4-188