TM 9-2350-222-34-1
PROCEDURE INDEX
PROCEDURE
PAGE
Disassembly
Cleaning
Inspection and Repair
Assembly
Testing
Installation
TOOLS:
Screwdriver
1/8-inch pipe thread fitting
Pressure gage
TEST EQUIPMENT:
Tube tester
Rags
Compressed air
Lockwasher
Rubber gloves
Crocus cloth
Caskets
REFERENCE (TM 9-2350-222-20-1-4)
PRELIMINARY PROCEDURE: Remove infrared power supply (TM 9-2350-222-20-1-3)
DISASSEMBLY:
1. Remove eight screws (A) and lockwasher (B)
securing two connectors (C) to base (D). Discard
2. Pull connectors (C) away from base (D) and
3. Remove two connecting gaskets (E).
Go to Sheet 2
Change 4 5-93