TM 9-2360-222-34-1
ENGINE REPLACEMENT (2D ENGINE) (Sheet 18 of 18)
42. Install shifting linkage and brackets (TM 9-2350-222-20-1).
43. Install steering linkage and brackets (TM 9-2350-222-20-1).
44. Check engine oil for proper level. Drain or fill if necessary (LO 9-2350-222-12).
45. Check transmission oil for proper level. Drain or fill if necessary (LO 9-2350-222-12).
46. Test run engine using powerplant test (ground hop) kit (TM 92350-222-20-1).
48. Install right angle drive, clutch, and pump (TM 9-2350-222-20-1).
End of Task
Change 1 3-35/(3-36 blank)