TM 9-2350-222-20-2-3-2
FLEXIBLE CHUTE INSTALLATION PROCEDURE (CONT)
36-81.
FRAME 2
Procedure
Step
Place flexible chute (1) so first link (2) will rest in two tabs (3) of fixed ammunition
1.
chute (4).
Release two locking pins (5) to lock flexible chute (1) to fixed ammunition chute (4).
2.
NOTE
Follow-on Maintenance Action Required:
After complete installation of the cupola machine gun
ammunition feed system, check for proper operation
(TM-10).
END OF TASK
Para 36-81 Cont
36-181