TM 9-2350-222-20-2-3-2
36-16. INTERCONNECTING BOX INSTALLATION PROCEDURE (CONT)
Procedure
Step
Place interconnecting box (1) in mounting position against cupola wall brackets.
1.
Put two screws (2) with two lockwashers (3) through interconnecting box bracket (1) and
2.
through turret wall brackets.
Put two Iockwashers (4) and two nuts (5) on two screws (2).
3.
4.
Using combination wrench and socket wrench, tighten screws (2) and nuts (5).
Using spanner wrench, connect connector (6) of cupola right hand contact board wiring
5.
harness (JPG).
Using spanner wrench, connect connector (7) of cupola left hand contact board wiring
6.
harness (JPG).
Using adjustable wrench, connect connector (8) of cupola power relay and power switch
7.
wiring harness (JPG).
NOTE
Follow-on Maintenance Action Required:
Install interconnecting box radio connector (JPG).
Install radio receiver R-442 (TM-10).
END OF TASK
Para 36-16 Cont
36-46