Home
Download PDF
Order CD-ROM
Order in Print
165-MM THREE ROUND AMMUNITION RACK INSTALLATION PROCEDURE
165-MM AMMUNITION RETAINING CLAMPS REMOVAL PROCEDURE
TM-9-2350-222-20-2-3-2 Turret for Combat Engineer Vehicle M728 (2350-00-795-1797) Manual
Page Navigation
137
138
139
140
141
142
143
144
145
146
147
TM
9-2350-222-20-2-3-2
28-5.
165-MM
THREE
ROUND
AMMUNITION
RACK
INSTALLATION
PROCEDURE
(CONT)
Step
Procedure
Using
socket
wrench,
attach
ammunition
rack
(1)
to
turret
ring
(2)
with
1.
three
bolts
(3)
and
six
Iockwashers
(4).
END
OF
TASK
Para
28-5
Cont
28-11