TM 9-2350-222-20-2-3-2
PERISCOPE STOWAGE BOX INSTALLATION PROCEDURE (CONT)
19-3.
Procedure
Step
Put periscope stowage box (1) into tank through opening for commander's cupola. Place
1.
stowage box on turret floor.
Tell support maintenance personnel to install commander's cupola.
2.
Traverse turret until periscope stowage box (1) can be reached from driver's compartment
3.
(TM-10).
Set turret traverse lock to LOCKED (TM-10).
4.
NOTE
Periscope stowage box should be installed with slotted
h o l e s for four mounting screws (2) at a centered
position.
Using socket wrench, attach periscope stowage box (1), with slots centered, to turret floor
5.
with four screws (2), four lockwashers (3) and four flat washers (4).
NOTE
Follow-on Maintenance Action Required:
Install lR periscope spare head stowage box para 15-
3).
END OF TASK
Para 19-3 Cont
19-5