TM9-2350-222-20-1-3
FUEL SHUTOFF VALVE, LEVER, LINK, AND BRACKET REPLACEMENT (EARLY MODEL)
(Sheet 1 of 9)
PROCEDURE INDEX
PAGE
PROCEDURE
Removal
Cleaning and Inspection
Installation
TOOLS:
5 in. extension with 1/2 in. drive
1/2 in. socket with 1/2 in. drive
7/16 in. combination box and open end wrench
10 in. adjustable wrench
7/16 in. socket with 1/2 in. drive
Long round nose pliers
Ball peen hammer
1/8 in. drive pin punch
Wire brush
vise
1 in. open end wrench
1-1/8 in. open end wrench
.
SUPPLIES: Sealing compound (Item 24, Appendix D)
Cotter pin (MS24665-132) (2 required)
Lockwasher (MS35338-45) (2 required)
Preformed packing (MS28778-10) (2 required)
Plastic cap
Lockwasher (MS35336-44) (2 required)
REFERENCE: TM 9-2350-222-10
PRELIMINARY PROCEDURES: Remove powerplant (page 5-1)
Pull fuel shutoff valve handle halfway up (TM 9-2350-222-10)
Go on to Sheet 2
TA253273
Change 1 7-197